Railroad and Transit

Central Avenue Grade Separation, Newark, CA

JMA is coordinating the UPRR and CPUC review and approvals of a new grade separation of Central Avenue.
Continue Reading →

California High Speed Rail Construction Package 4 (CP4), Wasco, CA

JMA is designing three shooflies of the BNSF mainline in Wasco, CA for California Rail Builders on the third segment of high-speed rail, to allow for the construction of new underpasses.
Continue Reading →

California High Speed Rail Construction Package 1 (CP1), Fresno, CA

JMA is designing three shooflies of the UPRR mainline and temporary crossing improvements in Fresno, CA for Tutor Perini/Zachry/Parsons, a JV, on the first segment of high-speed rail.
Continue Reading →

Port of Stockton 700 Yard Improvements, Stockton, CA

JMA designed a new rail yard consisting of approximately 20,000 feet of new track, supporting expanded UPRR and BNSF operations at the Port.
Continue Reading →

BNSF Main Line Realignment and Industrial Siding Improvements, Glendive, MT

JMA designed approximately 4,700 feet of new BNSF mainline and siding tracks to provide service to a new industrial user in Glendive.
Continue Reading →

VTA/BART Silicon Valley Berryessa Extension, Santa Clara County, CA

Engineer of record for the design of 9 wayside facilities supporting the 10.2 mile BART expansion into Silicon Valley. Prepared site layout, grading, drainage and utilities plans and coordinated all other disciplines’ packages.
Continue Reading →

Union Pacific Railroad Confidential Site Selection Study

JMA performed a detailed site selection study for UPRR for a confidential Fortune 500 company. The analysis included extensive GIS analysis of over 15 sites in 4 states.
Continue Reading →

Port of Redwood City Rail Improvements, Redwood City, CA

JMA evaluated existing Port track infrastructure, prepared improvement recommendations document, and design of new rail improvements.
Continue Reading →